Archived
TD0109: VM Separation Assurance Activity in SVPP
Publication Date
2016.10.03
Protection Profiles
PP_SV_V1.1
Other References
PP_SV_V1.1
Issue Description
The Assurance Activity for FDP_VMS_EXT.1 states that “FMT_MSA_EXT.1.2 is met if communication is unsuccessful in step (b).” This Assurance Activity actually tests FMT_MSA_EXT.1.1. Since FMT_MSA_EXT.1 relies exclusively on the FDP_VMS_EXT.1 AA to also serve as its AA, FMT_MSA_EXT.1.2 may not be fully tested by this AA in its current form. Resolution
The FDP_VMS_EXT.1 AA has been updated to better test FMT_MSA_EXT.1.2. The following is the updated assurance activity for FDP_VMS_EXT.1. Note the changes to steps (a), (c), and the paragraph about FMT_MSA_EXT: The evaluator shall examine the TSS to verify that it documents all inter-VM communications mechanisms (as defined above), including how the mechanisms are configured, how they are invoked, and how they are disabled. The evaluator shall perform the following tests for each documented inter-VM communications channel:
FDP_VMS_EXT.1.2 is met if communication is successful in step (d) and unsuccessful in step (f). FMT_MSA_EXT.1.1 is met if communication is unsuccessful in step (b). FMT_MSA_EXT.1.2 is met if communication is successful in step (d). Additionally, FMT_MSA_EXT.1 requires that the evaluator verifies that the TSS documents the inter-VM communications mechanisms as described above. The evaluator must ensure that the ST includes the following statement attesting that there are no other ways for data to be transferred between VMs other than those listed in FDP_VMS_EXT.1.1: A Guest VM cannot access the data of another Guest VM, or transfer data to another Guest VM other than through the mechanisms described in FDP_VMS_EXT.1.1 when expressly enabled by an authorized Administrator. There are no design or implementation flaws that permit the above mechanisms to be bypassed or defeated, or for data to be transferred through undocumented mechanisms. This claim does not apply to covert channels or architectural side-channels. Justification
These changes ensure that FMT_MSA_EXT.1.2 is fully tested by the Assurance Activity for FDP_VMS_EXT.1 so that the AA for FMT_MSA_EXT.1 is met if the AA for FDP_VMS_EXT.1 is met. |